Recent Projects
Farm Boy – Whitby, ON
Project awarded by VCL Construction based in Kanata, Ontario. Highly efficient Soprafix roof system supplied by Soprema allowed our team to produce a watertight envelope within four days, Totaling over 27,000 ft². This strategy allowed for building construction to continue ahead of schedule to meet the client’s opening deadlines. This roof system qualifies for a 10 year platinum warranty. 100% labor and material.
Grand Vista Condominiums – Oshawa, ON
27,042 Square Feet Soprema Inverted 2-ply Modified Bitumen Membrane
A 2-phase, 2 tower condominium development. Multiple elevations and complex details.
Bier Mark’t – Square One, Mississauga, ON
8,554 Square Feet IKO Modified Bitumen Membrane System
A time sensitive project undertaken in Spring 2014, a deadline of 14 days was offered regardless of weather conditions to maintain interior renovation progress. Composite base layers and torch applied cap sheet application.
Ontario Power Generation – Courtice, ON
200,000 Square Feet IKO Modified Bitumen Membrane System.
Energy star rated White granular faced cap sheet. Completed in 2013, this landmark building off Hwy 401 in Courtice, ON has built a strong relationship between Foran’s Roofing and Ontario’s largest utility provider. Foran’s Roofing is providing General Roof Maintenance annually to maintain this high performance roof system in top form.
CFB Trenton Hangar 6
200,000 Square Feet Firestone Fully Adhered TPO (Two-Tone Tan and Grey)
High performance 60 gauge TPO membrane fully bonded to a 5-layer substrate consisting of gypsum board, self adhering vapour barrier, 2 layers of polyiso insulation, 100PSI cover board followed by a unique 2-tone layout to achieve SRI / LEED qualification.